top of page
Project 11
A high voltage switch room carried out using metal containment.
The majority of the installation work was carried out off site, with the final fixings being connected on site.
bottom of page
A high voltage switch room carried out using metal containment.
The majority of the installation work was carried out off site, with the final fixings being connected on site.